New Zealand

Webinar: Electric Arc Furnace project at New Zealand Steel

Webinar: Electric Arc Furnace project at New Zealand Steel
  • Date From 29th May 2025
  • Date To 29th May 2025
  • Price From free
  • Location Online: 19:00 NZST. Duration: 1 hour.

Overview

Conrad Bezuidenhout, a Metallurgical Engineer with 30 years’ experience in the iron and steel industry, will present on the Electric Arc Furnace project at New Zealand Steel. Conrad will cover the impact of the EAF on New Zealand Steels’ greenhouse gas emissions and illustrate the process flow changes as a result of this major capital investment.

Speaker

Conrad Bezuidenhout, Project Director Electric Arc Furnace, New Zealand Steel

Conrad’s experience spans across technical and operational areas in mining and iron and steel production. He started his career in 1995 at Highveld Steel and Vanadium Corporation Ltd in South Africa, where he filled various roles in the process development laboratory, Steel Making and Iron Plants. Conrad was employed by New Zealand Steel in 2008 in the role of Iron Making Technologist and worked across mining and primary operations.

Time

19:00 - 20:00 NZST

Software

The presentation will be delivered via Microsoft Teams. We recommend downloading the app from the Microsoft website, rather than using the web portal. 

You are advised to join the webinar at least ten minutes before the scheduled start time, to allow for your computer to connect.

Webinar archive

This webinar is free of charge to members and open to all to attend, but if you wish to access the slides and a recording to replay on demand then you will need to be a member of the New Zealand member group.

Member-exclusive content

Become an IChemE member to enjoy full access to this content and a range of other membership benefits. If you are already a member, please log in.


Back to events