Water

Nutrem pilot plant facility site visit

Nutrem pilot plant facility site visit
  • Date From 22nd May 2019
  • Date To 22nd May 2019
  • Price From £25
  • Location Petersfield waste water treatment plant, Durford Road, Petersfield, GU31 4EZ

Overview

NUTREM has been operating successfully at Petersfield wastewater treatment works since September 2014. NUTREM is a complete Biological Nutrient Removal system, incorporating primary and secondary treatment. Results obtained demonstrate the system removing Total Phosphorus down to levels between 0.1 mg/l and 0.3 mg/l from average influent concentration of 5.41mg/l.

Speaker

Adam White

Adam has been with PWS since its inception in 2010. He steers product design and oversees installations. He has detailed knowledge of all aspects of the business and will be happy to respond to any queries. He is the Operations Director.

The material presented in this webinar has not been peer-reviewed. Any opinions are the presenter's own and do not necessarily represent those of IChemE or the Water Special Interest Group. The information is given in good faith but without any liability on the part of IChemE.


Back to events