National Early Careers Group UK and Ireland

Site Visit: Future Biogas Gonerby Moor Anaerobic Digestion Plant

Site Visit: Future Biogas Gonerby Moor Anaerobic Digestion Plant
  • Date From 8th June 2026
  • Date To 8th June 2026
  • Price £5.00.
  • Location Old Great North Road, Great Gonerby, NG32 2AB, United Kingdom.

Member-exclusive content

Become an IChemE member to enjoy full access to this content and a range of other membership benefits. If you are already a member, please log in.


Overview

Future Biogas' Moor Bioenergy plant in Gonerby Moor is a pioneering renewable energy facility that produces biomethane from locally sources crops. The plant also integrates innovative carbon-capture systems, highlighting practical pathways towards low-carbon energy.

Attendees will hear directly from the Head of Bioprocess, project engineers, managers during a dedicated panel session, offering insights into operational challenges, process optimisation and ongoing innovation.

The material presented has not been peer-reviewed. Any opinions are the presenter's own and do not necessarily represent those of IChemE or the National Early Careers Group. The information is given in good faith but without any liability on the part of IChemE.

Time

12:30–16:00 BST.

Agenda

  • 12:30 – Arrival at site: pickup from Grantham Station organised by Future Biogas Refreshments available on arrival
  • 13:00 – Introduction to Future Biogas followed by a safety briefing
  • 13:30 – Site tour 
  • 14:30 – Break
  • 14:45 – Panel discussion with the ESG Coordinator, Head of Bioprocess, Project Engineer, R&D Strategist, Business Development Director and Site Manager
  • 15:15 – Audience Q&A
  • 15:35 – Time to gather belongings and prepare to leave
  • 15:45 – Travel back to Grantham Station
  • 16:00 – Finish